logo

Qingdao KXD Steel Structure Co., Ltd kxdandy@chinasteelstructure.cn 86--13853233236

Qingdao KXD Steel Structure Co., Ltd Bedrijfprofiel
producten
Huis > producten > Metalen bouwwerk > Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation

Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation

Productdetails

Plaats van herkomst: Qingdao, China

Merknaam: KXD

Certificering: CE, ISO, SGS

Modelnummer: S-0051

Betaling & het Verschepen Termijnen

Min. bestelaantal: 500 vierkante meter

Prijs: US$ 50-80 per square meter

Verpakking Details: bulk voor stalen panelen, stalen pallet voor staalconstructies, houten doos voor kleine installatie-

Levertijd: 30-40 werkdagen

Betalingscondities: L/C,T/T

Levering vermogen: 3000 ton per maand

Krijg Beste Prijs
Productdetails
Markeren:

Single Storey Metal Frame Warehouse

,

Painted Surface Metal Frame Warehouse

,

Fast Installation Metal Frame Warehouse

Afmetingen:
Klantenvereiste
De deur:
schuifdeur of rollende deur
Kleur:
Verzoek van de cliënt
Bezoek:
Werkplaatsbezoek en controle beschikbaar
Oppervlakte:
Warm gegalvaniseerd / geverfd
Frame:
Staalstructuur
Levensduur:
Meer dan 50 jaar
Structuretype:
Hoge sterkte stalen structuur frame
Voorvervaardiging:
Buiten het terrein
Installatie:
Snel
Afmetingen:
Klantenvereiste
De deur:
schuifdeur of rollende deur
Kleur:
Verzoek van de cliënt
Bezoek:
Werkplaatsbezoek en controle beschikbaar
Oppervlakte:
Warm gegalvaniseerd / geverfd
Frame:
Staalstructuur
Levensduur:
Meer dan 50 jaar
Structuretype:
Hoge sterkte stalen structuur frame
Voorvervaardiging:
Buiten het terrein
Installatie:
Snel
Productomschrijving

Your Building details confirm to get the design & quotation:

Size

Length × Width × Length

Building Application

its exact usage or special requirements

Roof & Wall material

Steel sheet ? Insulated Panel ? Decorative Panel? 

Crane

yes or not? Ton?

Wind Load

wind speed km/h or m/s or mph?

Snow Load

snow weight kg/m2 or snow thickness or Kn/m2?

Door & Window

Sizes? Quantity? Layout? 

Inner Layout

Partition room?

More options

Parapet? Skylight? Ventilation? Canopy? Glass wall curtain?

Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation 0

We own more than 20 engineers who have abundant experience for various types buildings. Before design, all requirements will be collected from clients. The design will obey the requirements and pass the calculation check by the architectural soft, such as CAD, PKPM, 3D3S etc.

For the initial planning, we will design the construction blueprint after confirming the clients requirements details. With the check and feedback from the clients, we will make the revise if possible.

After the confirm, we will make further steel structure detailed drawing to prepare the production. This will still be offered to the clients to confirm. Double check will guarantee the building with correct details.

If necessary, finial 3D model will be offered if needed.

Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation 1

Items

Specification

Main steel frame

Column

Q355 Welded H Section Steel (equivalent to S355JR, ASTM A572 Gr. 50)

Beam

Q355 Welded H Section Steel (equivalent to S355JR, ASTM A572 Gr. 50)

Secondary Frame

Purlin

Q235 C and Z purlin (equivalent to S235JR, ASTM A36)

Knee brace

Q235 Angle Steel (equivalent to S235JR, ASTM A36)

Tie Rod

Q235 Circular Steel Pipe (equivalent to S235JR, ASTM A36)

Brace

Q235 Round Bar (equivalent to S235JR, ASTM A36)

Maintenance system

Roof Panel

EPS Sandwich Panel/ Giass Fiber Sandwich Panel/ Rock Wool Sandwich Panel

Wall Panel

Sandwich Panel/ Corrugated Steel Sheet

Accessories

Window

Aluminiumn Alloy Window/ PVC Window/ Sandwich Panel Window

Door

Sliding Sandwich Panel Door/ Rolling Metal Door/ Personal Door

Structure Usage

Up to 50 years

Finishing Options

Vast array of colors and textures available

Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation 2

Processing Steps of Prefabricated Steel Structure Buildings:

Planning and Design

Prefabricated steel buildings starts with a detailed planning and design phase. During this stage, the project’s requirements are identified, and the building’s specifications are established. Factors such as size, layout, and intended usage are considered to ensure that the final design meets the client’s needs. The planning phase also includes obtaining necessary permits and approvals, as local regulations may impact the building’s design.

 

Fabrication in the workshop

Once the design is finalized, the components are manufactured in a factory. The use of advanced technology in the manufacturing process ensures that the components are of  high quality and precisely engineered for quick assembly.

 

On-Site Assembly

After the prefabricated components are transported to the site, the assembly process begins. Since the parts are pre-engineered, they fit together seamlessly, making the installation process much faster than traditional construction methods. A skilled team of workers assembles the steel frame, attaches the wall panels, and installs the roofing system. Depending on the size and complexity of the building, the assembly process can take anywhere from a few days to a few weeks.

Contact further For Your Project!